Project No. 1
KHE CHE GOLF AND LUXURY RESORT
Location Description: the area with a potential and strength terrain for Golf construction and a beautiful landscape with Khe Che lake matches for relaxing; the area is far from Dong Trieu town center around 8 km, Ha Long City around 60km, Noi Bai International Airport around 80km, Hai Phong Cat Bi Airport around 50 km, National Route No. 18 around 8km, Ha Noi – Ha Long (as planning) highway line around 1km.
+ The North is adjacent to the hilly land for forest cultivation;
+ The West and the South are adjacent to land for cultivation perennial trees and current residential area;
+ The East is adjacent to hilly land for cultivation of forest and perennial tree.
- Pursuant to Decision No. 2622/QĐ-TTg, dated December 31, 2013 of Prime Minister approving the planning construction of Quang Ninh province socio-economic development to 2020 and the view of next 2030;
- Pursuant to Decision No. 1588/QĐ-UBND dated July 28, 2014 of People’s Committee of Quang Ninh Province approving the general planning of Quang Ninh area to 2030 and the view of next 2050 and after 2050;
- Pursuant to Decision No. 1618/QĐ-UBND dated July 9, 2015 of People’s Committee of Quang Ninh province approving the general planning of Dong Trieu Town socio-economic development to 2030 and the view of next 2030.
- The current legislation documents.
4. In terms of infrastructure: project is supported with electric, water and means of communication.
5. In terms of labors: project is supported with suitable recruiting laborers.
The Investment Promotion and Enterprises Support Agency Quang Ninh province or People’s Committee of Dong Trieu Province for detailed information and concrete introduction and guidance.
Project No. 2
CENTER OF GENERAL SERVICE AND CULTURE
Location Description: the area is adjacent to the Provincial Gateway, which is the East Gateway of Quang Ninh province; the area is near the National Route No. 18 and far from Dong Trieu town center around 6 km, Ha Long City around 65km, Noi Bai International Airport around 80km and Hai Phong Cat Bi Airport around 50 km.
+ The North and the South are adjacent to agricultural land;
+ The East is adjacent to current residential area and agricultural land;
+ The West is adjacent to a stop-over near Provincial Gateway project.
- Pursuant to Decision No. 145/QĐ-UBND dated January 16 2016 of People’s Committee of Quang Ninh province “approving the construction subzone planning of the center of general service and culture with a scale of 1/2000 at Binh Duong commune, Dong Trieu Town;
1. In terms of land acquisition: Quang Ninh province has responsibilities to supply guidance, land confiscation; compensation; supports and resettlement according to the regulation.
1. In terms of infrastructure: project is supported with electric, water and means of communication.
2. In terms of labors: project is supported with suitable recruiting laborers.
3. In terms of administrative procedure: project is supported with administrative procedure settlement according to one-door mechanism and ultimate supports to investors while implementing the project;
Tthe Investment Promotion and Enterprises Support Agency Quang Ninh province or People’s Committee of Dong Trieu Province for detailed information and concrete introduction and guidance.
Project No. 3
TRADING CENTER AT THE NORTH OF DETOUR ROUTE OF DONG TRIEU WARD
Location Description: the area which is at the North of detour route of Dong Trieu ward, is near the National Route No. 18 and far from Dong Trieu town center around 1 km, Ha Long City around 60km, Noi Bai International Airport around 80km and Hai Phong Cat Bi Airport around 50 km.
+ The north is adjacent to Dam river;
+ The East is adjacent to vocational driving school;
+ The South is adjacent to National Route No. 18;
+ The West is adjacent to residential area and Dam River.
6. Investment method: 100% of non-state budget or proposed budget by the Investors.
7. Project progress: 2016 - 2020
8. Project situation: Planning mission was approved; planning subzone is being completed, investment project has not temporarily been made;
9. Basis for project establishment:
- Pursuant to Decision No. 1412/QĐ-UBND dated December 19 2011 of People’s Committee of Quang Ninh province “approving the construction subzone planning of two sides of detour route of Dong Trieu Town with the scale of 1/2000”;
10. Socio-economic effects brought by the project: when the project finishes and comes into use, the demands of trading service, high quality products and diversified tourism products of locality in particular and Quang Ninh province in general will be met; developing the advantages and potentialities of central zones creates more jobs and improves the local materials and spiritual lives as well as increases the Quang Ninh province’s economic tourism and service development.
11. Preferred policies:
Implemented according to regulation of the law on investment and policies of Quang Ninh province.
12. Investment supports of Quang Ninh province:
2. In terms of infrastructure: project is supported with electric, water and means of communication.
4. In terms of administrative procedure: project is supported with administrative procedure settlement according to one-door mechanism and ultimate supports to investors while implementing the project;
13. Contact with:
Project No. 4
DONG TRIEU INDUSTRIAL ZONE
Location Description: the area which is at the North of National route No. 18 near Uong Bi city and far from Dong Trieu town center around 15 km, Ha Long City around 50km, Noi Bai International Airport around 90km and Hai Phong Cat Bi Airport around 40 km.
+ The North and the East are adjacent to hilly land for forest cultivation;
+ The South is adjacent to Yen Vien – Cai Lan railway;
+ The West is adjacent to agricultural land and Yen Duong lake;
- Pursuant to Decision No. 2622/QĐ-TTg, dated December 31, 2013 of Prime Minister approved on planning construction of Quang Ninh province socio-economic development to 2020 and the view of next 2030;
- General planning of Dong Trieu Town to 2030 and the view of next 2050;
The Management Board of Quang Ninh Economic zone or People’s Committee of Dong Trieu Province for detailed information and concrete introduction and guidance.
Project No. 5
AN SINH INDUSTRIAL CLUSTER
Location Description: the area is at the West of provincial route No. 345 connecting Quang Ninh and Bac Giang province; it is far from Dong Trieu town center around 8 km, Ha Long City around 65km, Noi Bai International Airport around 80km and Hai Phong Cat Bi Airport around 50 km.
+ The North is adjacent to the planning cemetery of the town;
+ The East is adjacent to the Provincial route No. 345;
+ The South and the West are adjacent to hilly land for forest cultivation and perennial plant.
- Pursuant to Decision No. 397/QĐ-UBND date February 4, 2016 of People’s Committee of Quang Ninh province approving the adjustments and supplements the development planning of Quang Ninh industrial clusters to 2020 and the view of next 2030”.
3. In terms of labors: project is supported with suitable recruiting laborers.
Project No. 6
KIM SEN INDUSTRIAL CLUSTER
Location Description: the area is at the south of National Route No. 18; it is far from Dong Trieu town center around 5 km, Ha Long City around 60km, Noi Bai International Airport around 80km and Hai Phong Cat Bi Airport around 40 km.
+ The North is adjacent to the National Route No. 18;
+ The East is adjacent to the land of current industrial factories;
+ The South is the by pass road according to the planning.
+ The West are adjacent to agricultural land and residential area.
- Pursuant to Decision No. 1122/QĐ-UBND dated April 13, 2016 of People’s Committee of Quang Ninh province approving the subzone planning of Kim Sen industrial cluster with a scale of 1/2000 at Kim Sen ward, Dong Trieu town”.
1. In terms of land acquisition: Quang Ninh province has responsibilities to supply guidances, land confiscation; compensation; supports and resettlement according to the regulation.
Project No. 7
CEMETERY PARK FOR WESTERN COUMMUNES OF DONG TRIEU TOWN
1. Location: An Sinh commune, Dong Trieu Town, Quang Ninh province, Vietnam.
Location Description: the area is at the West of provnical route No. 345 connecting Quang Ninh and Bac Giang province; it is far from Dong Trieu town center around 8 km, Ha Long City around 65km, Noi Bai International Airport around 80km and Hai Phong Cat Bi Airport around 50 km.
+ The North and West are adjacent to hilly land for forest and perennial plant cultivation;
+ The South is adjacent to the planning An Sinh industrial cluster.
2. Aim: to invest cemetery’s infrastructure
3. Scale: Researched area: around 20 hectares.
4. Land use situation: land for penennial trees and other annual plants.
5. Total expected investment: proposed by investors.
8. Project situation: Project is updated to the general planning, the detailed planning and investment project have not temporarily been made.
10. Socio-economic effects brought by the project: when the project finishes and comes into use, the demands of cemetery land for local people will be met. The Project creates not only a cemetery park with a beautiful view and a synchronous infrastructure but also more jobs and improves the local materials and spiritual lives.
The Investment Promotion and Enterprises Support Agency Quang Ninh province or People’s Committee of Dong Trieu Province for further information and concrete introduction and guidance
Project No.8
NORTHERN BY-PASS ROUTE OF DONG TRIEU TOWN
Location Description: the expected investment area is at the northern National Route No. 18. That is the by-pass route of Dong Trieu town center connecting with the East – West inter-provincial route and the by pass route of Uong Bi city. It also is the motivated route to develop the central area to the South of National Route No. 18.
- Length: around 30km
- Line section: 14,5m artery + 3m sidewalk + 5,5 m frontage road+ 6m central reserve (trees) + 10,5m roadway + 2m central reserve (trees) + 5.5m frontage + 3m sidewalk + 14.5m artery
- Location: starting point at km 49+800 of Thuy An commune (connecting point with the National Road No. 18) end point connecting to Hai Duong province by a new constructed bridge over Dong Mai river;
8. Project situation: Project is updated to the general planning; investment project has not temporarily made;
Implemented according to regulation of the law on investment and policies of Quang Ninh province
The Investment Promotion and Enterprises Support Agency Quang Ninh province or People’s Committee of Dong Trieu Province for further information and concrete introduction and guidance.
Project No. 9
CONNECTING ROUTE FROM TRIEU BRIDGE TO HAI DUONG PROVINCE
1. Location: Hong Phong commune, Dong Trieu Town, Quang Ninh province, Vietnam.
Location Description: The expected location is at the west of provincial route No. 332 currently connecting to Hai Duong province. This is a new route line – an inter-provincial route of Quang Ninh and Hai Duong province. It is also a connecting point of National Route No. 18 to Hai Duong province toward south – north. The route is a foreign route line of Dong Trieu .
- Length: around 3km
- Line section: 7.5m roadway x 02 lines, 5m central reserve (trees), 4.5m sidewalk of two sides.
Location: starting point at km 51 of Hong Phong commune(connecting point with the National Road No. 18) end point connecting to Hai Duong province by a new constructed Trieu bridge.
4. Land use situation: current construction soil, partial residential land and agricultural land.
5. Total expected investment: proposed by investors
6. Investment method: BOT or BT
7. Project progress: 2015 - 2020
8. Project situation: Project is updated to the general planning; investment project has not temporarily been made;
10. Socio-economic effects brought by the project: when the project finishes, it will create an East - West inter-provincial route of Dong Trieu town; to expand the central development space toward the south of Dong Trieu town; to increase Dong Trieu socio-economic development;
Project No. 10
IMPROVING PROVINCIAL ROUTE NO. 333 AND XUAN YEN BRIDGE CONNECTING TO HAI PHONG CITY
Location Description: the expected location is at the upper part of current provicial Route No. 333 connecting to Hai Phong city. It is the improved and upgraded route combining with building a new Xuan Yen bridge through Da Vach river. The route is an inter-provincial route connecting from Quang Ninh province to Hai Phong city and an inter-provincial route from the National Route No. 18 to Hai Phong city toward North – South. It is also an inter-provincial route of Dong Trieu town; to expand the development space toward the east of current centre.
- The length: around 4km;
- Line section: 5m sidewalk + 9m roadway +5m sidewalk.
Location: starting point at km 65+800 of Hoang Que commune (connecting point with the National Road No. 18) end point connecting to Hai Phong province by a new constructed Xuan Yen bridge.
10. Socio-economic effects brought by the project: when the project finishes, it will create foreign transport toward the North – South of Dong Trieu town and expand the development space toward the east of current center as well as increase Dong Trieu town’s socio-economic development.
Project 11:
IMPROVE THE ROUTE CONNECTING TO NATIONAL ROUTE NO. 18 AT THUY AN COMMUNE, PASSING NGUYEN HUE COMMUNE CONNECTING TO HAI DUONG PROVINCE BY BAC BRIDGE OVER DONG MAI RIVER
1. Location: Thuy An commune, Dong Trieu Town, Quang Ninh province, Vietnam.
Location Description: the expected investment location, which is at Thuy An – Nguyen Hue inter-commune road connecting to the National Route No. 18. It is the improved, ungraded road which also builds up a new bridge passing Dong Mai River and an inter-provincial route connecting Quang Ninh and Hai Duong provinces and inter-provincial route line of Dong Trieu town and expands development space of agricultural communes toward the West.
- The length: around 5km;
10. Socio-economic effects brought by the project: when the project finishes, it will create an inter-provincial route toward the North – South of Dong Trieu town and expand the development space toward the east of current center as well as increase Dong Trieu town’s socio-economic development.
Project No. 12
NEW ADMINISTRATIVE – POLITICAL CENTER OF THE TOWN
1. Location: Kim Son ward, Dong Trieu Town, Quang Ninh province, Vietnam.
Location Description: the expected investment location which is at the new administrative – political center of the town, has a center route passing.
+ The North is adjacent to the planning head office of town police;
+ The East is adjacent to the planning head office of military steering committee;
+ The South is adjacent to the planning central square;
+ The West is adjacent to the planning central road.
8. Project situation: project is update to the general planning; investment project has not temporarily made;
Project No. 13
HEAD OFFICE OF THREE NEW WARDS OF MAO KHE
1. Location: Mao Khe ward, Dong Trieu Town, Quang Ninh province, Vietnam.
Location Description: the expected investment location, which is at areas of Vinh Hoa, Vinh Phu and Vinh Son belonging to the planned separated wards.
10. Socio-economic effects brought by the project: when the project finishes, it will create a foreign transport toward the North – South of Dong Trieu town and expand the development space toward the east of current center as well as increase Dong Trieu town’s socio-economic development.
People’s Committee of Dong Trieu Province for further information and concrete introduction and guidance.
Project No. 14
HIGH QUALITY MULTI-LEVEL SCHOOLS
Location Description: the area is in the planning central area and far from Dong Trieu town around 5 km, Ha Long City around 60km, Noi Bai International Airport around 80km, Hai Phong Cat Bi Airport around 40 km.
Training levels include kindergarten, Primary and Secondary schools.
Land used area: 7.7 hectares.
8. Project situation: project is calling for new investment. Planning and investment project have not temporarily made.
- Benefited from preferred policies according to the regulation on lines of preferred investment;
- Benefited from preferred invesment policies according to the regulation (if any);
Project No. 15
COPERATE UNIVERISTY
Location Description: the area which is located at the beautiful scenery area, is adjacent to Yen Vien – Cai Lan railway. It is far from Dong Trieu town center around 7 km, Ha Long City around 60km, Noi Bai International Airport around 80km, Hai Phong Cat Bi Airport around 40 km.
+ The North and the west are adjacent to the planning tourism route;
+ The East is adjacent to the current resident land and land for cultivation perennial trees;
+ The South is adjacent to Yen Vien – Cai Lan railway.
8. Project situation: project is calling for new investment. Planning and investment project have not temporarily been made.
12. Investment supports of Quang Ninh province::
Project No. 16
MAO KHE WARD STADIUM
Location Description: the area is at the center of Mao Khe ward; it is far from Dong Trieu town center around 9 km, Ha Long City around 50km, Noi Bai International Airport around 90km, Hai Phong Cat Bi Airport around 40 km.
+ The North is adjacent to Huy Hoang Kindergarten;
+ The East is adjacent to Ha Lan Park;
+ The South is adjacent to current residential land;
+ The West is adjacent to the planning residential area;
Benefited from preferred invesment policies according to the regulation (if any);
The Planning and Investment Department of Quang Ninh province or People’s Committee of Dong Trieu Province for further information and concrete introduction and guidance.
Project No. 17
EXPANSION OF HIGH QUALITY APPLIED AGRICULTURE CLUSTER
+ The East is adjacent to the coal conveyor of north east coal company;
+ The South is adjacent to aquatic products nursery and breeding;
- Pursuant to Decision No. 575/QĐ-TTg dated May 4, 2015 of Prime Minister approving the general zone planning and hi-tech applied agriculture to 2020 and with the view of next 2030;
- Pursuant to Decision No. 2872/QĐ-UBND dated October 29, 2012 of People’s Committee of Quang Ninh province approving the subzone planning of hi-tech applied agricultural zone with a scale of 1/2000 at Hong Thai Tay commune, Dong Trieu town;
Department of agriculture and Rural Development of Quang Ninh province or People’s Committee of Dong Trieu Province for further information and concrete introduction and guidance.
Project No. 18
PURE - BRED BREEDING PIG
1. Location: Trang Luong commune, Dong Trieu town, Quang Ninh province, Vietnam.
Location Description: the area is far away from the residential with a large plan covered by hills with safety and hygienic condition and water surface. It is far from Dong Trieu town around 20 km, Nam Mau – Ho Thien pilgrimage route around 7 km, Ha Long City around 40km, Noi Bai International Airport around 100km, Hai Phong Cat Bi Airport around 40 km.
Department of Agriculture and Rural Development of Quang Ninh province or People’s Committee of Dong Trieu Province for further information and concrete introduction and guidance.
Project No. 19
BREEDING CONCENTRATION AREA
1. Location: An Sinh commune, Dong Trieu town, Quang Ninh province, Vietnam.
Location Description: the area is far away from the residential with a large plan with safety and hygienic condition and water surface. It is far from Dong Trieu town around 10 km, Ha Long City around 50km, Noi Bai International Airport around 80km, Hai Phong Cat Bi Airport around 50 km.
Project No. 20
CONCENTRATION AREA IN CATLLE AND POULTRY SLAUGHTER
1. Location: Hong Thai Tay commune, Dong Trieu town, Quang Ninh province, Vietnam.
- Pursuant to Decision No. 1753/QĐ-UBND dated June 10, 2016 of People’s Committee of Quang Ninh province approving the adjustments and supplement of concentration areas in cattle and poultry slaughter in the period of 2016 0 2020;
Project No. 21
1. Location: Nguyen Hue commune, Dong Trieu town, Quang Ninh province, Vietnam.
Location Description: the area is far away from the residential with a large plan with safety and hygienic assurance. It is far from Dong Trieu town around 10 km, Ha Long City around 50km, Noi Bai International Airport around 80km, Hai Phong Cat Bi Airport around 50 km.
For the project implementation procedures for issuance of investment certificate of registration (not the case accepted investment policy) time is 10 working days. For the project implementation procedures acceptable investment policy, after the provincial People's Committee granted the investment policy, after 03 days Economic Zone Management Committee granted the investment registration certificate.
Visit the decision No 3456 / 2015 / QD-UBND ngay 02/11/2015 Quang Ninh Provincial People's Committee on the Regulation on the order details, tuht continue implementing and managing projects funded by off-budget state and investment projects in the form of public-private partnership (PPP)
Implementation steps
Name of procedure
Appraisal agencies
Agency approved
Solving time
1
Procedures approved study site planning
Promotion Committee and Investment Support
Provincial People's Committees
09
2
Appraisal and approval of planning tasks
Department of construction
20
3
Appraisal and approval of detailed construction planning
4
The procedures for deciding investment policy
Issuance of investment registration certificate
Department of Planning and investment
15
10 (03)*
5
Evaluating the design basis
08-12
6
Appraisal and approval of reports on environmental impact assessment
Department of Natural Resources and Environment
7
Procedures for land allocation, land lease
8
Certificates of land use rights, house ownership rights and assets attached to land
9
Construction Licensing Procedures
Department of construction (Local People's Committees)
* For projects implemented procedures for granting investment registration certificate (not the case with the investment policy approved) time is 10 working days. For the project implementation procedures approved investment policy, after the People's Committee of Quang Ninh province granted investment policy is 03 days after the Department of Planning and Investment shall grant investment registration certificate.
* Refer to the Decision No. 3456/2015 / QD-Committee dated 11/02/2015 of People's Committee of Quang Ninh province on detailed regulations on the order and procedures for the implementation and management of investment projects with capital state budget and investment projects in the form of public-private partnership (PPP)
Xúc tiến đầu tư Đông Triều